![Mindanao Railway Project Future Phases mindanao railway project future phases](https://i0.wp.com/thephilippinestoday.com/wp-content/uploads/2020/11/mindanao-railway-project-future-phases.jpg?resize=680%2C680&ssl=1)
Mindanao Railway Project Future Phases
Tagum-Davao-Digos
Length (km): 100
Propose Phase of Construction: 1
Digos-General Sants-Marbel
Length (km): 150
Proposed Phase of Construction: 2
Tagum-Butuan
Length (km): 214
Proposed Phase of Construction: 3
Marbel-Kabacan-Bukidnon-Cagayan de Oro/Davao-Bukidnon-Cagayan de Oro
Length (km): 180
Proposed Length of Construction: 4/5
Butuan-Cagayan de Oro
Length (km): 170
Proposed Length of Construction: 4/5
Cagayan de Oro-Iligan-Pagadian
Length (km): 216
Proposed Length of Construction: 6/7/8/9/10
Pagadian-Cotabato-Kabacan-Digos
Length (km): 242
Propose Length of Construction: 6/7/8/9/10
Pagadian-Dipolog
Length (km): 122
Proposed Length of Construction: 6/7/8/9/10
Pagadian-Zamboanga
Length (km): 222
Proposed Length of Construction: 6/7/8/9/10
Butuan-Surigao
Length (km): 97
Proposed Length of Construction: 6/7/8/9/10