Sto. Niño Parish Church Bohol

  The Sto. Niño Parish Church Bohol The Sto. Niño Parish Church Complex in the town of Cortes, about 10 km. from Bohol’s capital, Tagbilaran, was constructed atop a cliff overlooking the Abatan River delta. Note: A delta is an area of low, flat land shaped like a triangle, where a river splits and spreads … Read more

Mindanao Railway Project Future Phases

Mindanao Railway Project Future Phases Tagum-Davao-Digos Length (km): 100 Propose Phase of Construction: 1 Digos-General Sants-Marbel Length (km): 150 Proposed Phase of Construction: 2 Tagum-Butuan Length (km): 214 Proposed Phase of Construction: 3 Marbel-Kabacan-Bukidnon-Cagayan de Oro/Davao-Bukidnon-Cagayan de Oro Length (km): 180 Proposed Length of Construction: 4/5 Butuan-Cagayan de Oro Length (km): 170 Proposed Length of … Read more

RT-PCR Test Fees for Non-OFWs

  RT-PCR Test Fees for non-OFWs arriving in the Philippines Manila-Bound Php 4,000 – USD, Cash, and Card accepted within 48 hours result. Cebu Bound Php- 5,000 – Php and Visa Card accepted 12-24 hours result. Since October 16, 2020, there have been changes in the cost of swab tests for returning non-OFWs in Manila … Read more

Mindanao Railway Project

Mindanao Railway Project Overview of the Project 1,544-km railway system that will connect Mindanao Cities, namely: Davao, General Santos, Cagayan de Oro, Iligan, Cotabato, Zamboanga, Butuan, Surigao, and Malaybalay. The first phase is the Tagum-Davao-Digos Segment with eight (8) stations within its alignment in Tagum, Carmen, Panabo, Mudiang, Davao, Toril, Sta. Cruz, and Digos. It … Read more

Binondo-Intramuros Bridge

Binondo-Intramuros Bridge Project The ongoing construction of the Binondo-Intramuros Bridge. The 710-meter bridge project will connect Intramuros at Solano Street and Riverside Drive and Binondo at San Fernando bridge with a viaduct structure over Estero de Binondo. Its target completion is 2021. The bridge is 50% complete as of February 4, 2021. The bridge can … Read more